INVESTIGATION OF SHIP/SHIP COLLISIONS
1991.
Project Manager. Assessment of the damage to the ships and simulations of the collision in order to determine the speed of the ships at the time of the impact for the collision between Dronning Margrethe and Bore Brittanica. Client: DSB.
|
1989.
Assessment of damage and speed in the collision between M/V Danalith and M/T Arzew. Client: The Survey Association.
|
1977-80.
PhD work. Development and implementation of a mathematical/numerical procedure for transient simulation of collisions between two ships.
|