PREPARATION AND SUPERVISION OF MODEL TESTS
2007.
Supervision of model tests performed at Marintek for the Peregrino Field FPSO.
|
2006.
Supervision of model tests performed at Marintek for the Vincent Field FPSO.
|
2005-06.
Project Manager for model tests with the wave energy device “Bølgemøllen”.
|
2002-03.
Project Manager. Hydrodynamic model tests of the float-over installation of the topsides and docking installation of the jacket for the Azeri field in the Caspian Sea offshore Azerbaijan. Client: Saipem, Italy for AIOC, Azerbaijan.
|
2001.
Project Manager. Model tests for determination of hydrodynamic coefficients for wave-in-deck loading. The tests were performed in Grosse Wellen Kanal at FZK in Hannover, Germany as a part of the EU-TMR-LSF-Programme. Client: The Danish Energy Authorities.
|
2000-01.
Project Manager. Model tests for the design of a Tripod Catenary Mooring System for an FSO to be installed at 125 m water depth at the Chestnut field in the British sector of the North Sea. Client: Brovig Production Services Ltd., UK.
|
2000.
Project Manager. Model tests for the design of a Tripod Catenary Mooring System for an FPSO to be installed at 75 m water depth at the Isis field offshore Tunesia. Client: Brovig Production Services Ltd., UK.
|
1998.
Quality Assurance. Model testing of a side-by-side floating gas storage and offloading system for Bayu-Undan. Client: BHP Petroleum, Australia.
|
1997-00.
Supervision of researchers conducting model tests in the 3-D offshore basin at DHI during the EU-TMR-LSF Programme. Client: European Commission.
|
1997.
Project Manager. Hydraulic model tests for determination of the flow resistance of bridge piers and protective islands for the Øresund Bridge. Client: Øresundskonsortiet.
|
1996-97.
Project Manager. Hydrodynamic model tests of the float-over installation of a 20,000 dwt integrated deck structure from a barge to a jacket. Client: Saipem, Italy.
|
1996.
Project Manager. Model test for the design of a data transmission buoy for radio transmission of metocean data from an offshore site to DHI.
|
1996.
Project Manager. Hydraulic model testing of the transportation and installation of the tunnel elements for the Øresund Link. Client: Øresund Tunnel Contractors A/S.
|
1995-96.
Quality assurance for the model testing of a side-by-side offshore loading system for LPG for the N’Kossa Field Offshore Congo. Client: Anchor Storage Ltd.
|
1994-95.
Supervision of various research teams during testing in the 3D offshore facility at DHI during the Large Scale Facilities programme. Client: The EU.
|
1994.
Project Manager. Model tests for determination of the dynamic response of mono-tower platform to non-linear wave loading. Client: Ministry of Energy, Denmark.
|
1993.
Project Manager. Model tests to determine the feasibility of ROLF – a novel flexible riser system for loading of oil offshore. Client: Shell Expro, Aberdeen.
|
1992.
Lead Engineer on the lifting test for the jacket structure and the lifting and transportation tests for the topsides structure for the Dunbar jacket and topsides. Client: AMEC Engineering.
|
1990.
Project Manager. Model tests for verification of numerically computed non-linear hydrodynamic forces on floating structures. The tests were performed as a part of the research project Rational procedures for advanced non-linear analysis of floating structures (BRITE project P-2146) Client: European Commission.
|
1989.
Project Manager. Model tests for determination of hydrodynamic loads on typical jacket joints in steady flow.
|
1989.
Project Manager. Model tests for determination of hydrodynamic loads on a jacket in waves.
|