DAMAGE ASSESSMENT
2009.
Investigation of the cause for the disconnection from the moorings for the wave energy device Wave Plane.
|
1995.
Investigation of the sinking of M/V Charm.
|
1991.
Co-ordinated the assistance to NC in their evaluation of the Sleipner ‘A’ Accident. Performed simulations of the sinking of the Sleipner ‘A’ gravity base structure. Client: Norwegian Contractors.
|